• Looking East along Aviation Drive in June 2026 with line marking, signage and bollard installation complete

    Aviation Drive, connecting South Australian Aviation Museum to Bedford Street, was fully refreshed with 330m of new asphalt, drainage and concrete kerbing.

  • Nearly complete Olympic Dam contaminated waste disposal facility

    Platinum was the Head Contractor directly to the MOPS division of BHP in the delivery of a strategic new facility for the ongoing mining activities at Olympic Dam. Notable challenges were overcome to complete the project swiftly, successfully and within the revised budget.

  • Three workers in appropriate PPE using hydraulic trenching to locate underground services

    Following on from the successful delivery of the CWDF, and Platinum’s commitment to working collaboratively with BHP, Platinum was engaged to deliver Slot Trench Investigation works for the Sustaining Surface Power Project.